We have three building plots for you in Głazica (Szemud commune)!
The plots have a building conditions decision issued before the division. Currently, formalities are underway to obtain individual building condition decisions for each of the plots.Exact location by entering Google Maps coordinates: 54°30'22.9"N 18°11'21.9"E
We offer plots with cadastral numbers:- 29/37 (1412 m2)
- 29/38 (1005 m2)
- 29/39 (1005 m2)
The plots were created as a result of the division of plot No. 29/16It is possible to purchase one, two or all three plots.Location:The plots are located in picturesque Głazica, situated in Szemud commune, surrounded by green areas and forests. This is an ideal place for people seeking peace, tranquility and closeness to nature, away from urban hustle and bustle.
Głazica is excellently connected, thanks to its proximity to the S6 Kashubian Route, which ensures quick access to Trójmiasto and other localities in the region.
Plots:All three plots are rectangular in shape, flat and unfenced. Access to the plots is via a hardened road made of concrete slabs, which ensures comfortable access to the property.
It is worth noting that the division also took into account a separate plot No. 29/36 (visible in the photos as a narrow strip adjacent to the municipal road), which constitutes an extension of the public municipal road.
Moreover, plots 29/38 and 29/39 also have access to private road No. 29/8 marked in black outline in the photos.
Building conditions:The plots are covered by building conditions decisions, allowing for single-family residential development.
1. Type of investment - construction of three single-family residential buildings with infrastructure on plot No. 29/16 in the Głazica cadastral district, Szemud commune - the location of the planned investment is determined by attachment No. 1 to this decision.
2. Conditions and detailed principles for land management and construction resulting from the provisions of separate regulations, in the scope of:1) protection and shaping of spatial order:a) type of investment: single-family residential development,
standards for single-family residential building construction:
- single-storey building with the possibility of a usable or non-usable attic, provision for a basement is considered,
- maximum height of 9.0 m from the average ground level at the main entrance to the building to the ridge,
- floor height of the ground floor max 0.8 m from ground level on the side of the main building entrance,
- roof eave height up to 4.5 m above ground level on the side of the main entrance to the building,
- width of front facade up to 14.0 m with tolerance up to 20%,
- roof geometry - double and multi-pitched roof over the main building volume, roof slope angle of the roof over the main building volume from 30° to 45° (roof geometry and slope angle over the main building volume does not apply to bay windows, dormers, connectors, terrace canopies and winter gardens),
- ridge direction - parallel or perpendicular to plot no. 29/8,
b) roofs main building structure: roof covering with roof tiles or tile-like material in brick red or graphite color,
c) building coverage area:
- up to 180 m² for residential building,d) biologically active area - min. 60% of plot area,
e) non-crossing building line:
- min. 6.0 m from road plot no. 29/8,
- min. 9.0 m from municipal road plot no. 30,
- maintain appropriate distances from power lines in accordance with applicable regulations,
f) the minimum area of a building plot designated for single-family residential development is 1000.0 m²,
g) any existing drainage network should be preserved, and the implementation of the investment must not worsen the technical condition of this facility,
h) other conditions in accordance with the regulation concerning technical conditions that buildings and their location should meet (i.e. Journal of Laws of 2019, item 1065 as amended),
i) a decision must be obtained specifying the conditions for excluding the land from agricultural production (Art. 11 (4) of the Act on the protection of agricultural and forest land - i.e. Journal of Laws of 2021, item 1326 as amended).
3) Services in the scope of technical infrastructure and communication:a) water supply - own intake (well) or from the water mains after its construction under the conditions of Gminne Przedsiębiorstwo Komunalne Szemud Sp. z o.o.,
b) sewage disposal to a sealed septic tank for sewage storage emptied periodically by a specialized company (tank location rules in accordance with the Regulation of the Minister of Infrastructure of April 12, 2002 on technical conditions that buildings and their location should meet - Journal of Laws 2019, item 1065), after the construction of the sewage system, the aforementioned tank must be liquidated and all facilities must be connected to the sewage system,
c) electricity supply under the conditions of "Energa-Operator SA" Branch in Gdańsk,
d) rainwater drainage within the property boundaries - rainwater drainage must be secured in a way that protects the property and neighboring properties from water erosion - prohibition of flooding neighboring areas,
e) the implementation of rainwater collection tanks for later use for household purposes, e.g. garden watering, is permitted,
f) heat supply - individual heating using commonly available energy sources, a low-emission heat source is planned.
For interested clients, we will provide the full building conditions decisionPlot dimensions: 29/38 and 29/39 (28m x 36m), 29/37 (58m x 24.4 m)
Utilities:
- water: from well,
- sewage disposal: septic tank,
- electricity: from overhead line from nearest neighbor
Legal status: full ownership with land register (clear mortgage).
Delivery date: immediately, after payment of the purchase price
If you are looking for a plot in Szemud municipality, in a quiet location with convenient access to the city, this offer is for you!
I will provide all information to interested parties by phone or directly at a meeting.
I invite you to contact me!